PT Tanjung Power Indonesia

BOD Material Stock Dashboard

Executive boardroom view for coal, silica sand, LFO, and limestone — focused on stock risk, supply continuity, readiness, and decision action.
Selected period: - Embedded data Trend range: 1 Year

Executive Material Risk Position

Board-level snapshot: where the stock risk is, what action is required, and which material needs escalation.

-

Material Stock Risk Matrix

BOD Decision Focus

Stock vs Target (%)

Unit-agnostic: 100% = target stock. Bars colored by risk status; axis capped at 150%.

Cover Days by Material

Axis capped at 60 days so short-cover materials (Coal) stay readable. ▸ = actual cover beyond 60d. Bars colored by risk status.

Projected D+30 Cover Days · INDIKATIF

Linear model: constant daily usage + incoming spread evenly over 30 days. No delivery lumpiness/stochasticity — indicative only, not a commitment.

Projection Assumption Snapshot

Editable Board Action Plan

Coal — Supply Continuity

Separate view for coal stock, consumption, received volume, HHV and unit consumption pattern.

-

Coal Consumption vs Received

Coal Stock & Cover Days

Coal Unit Consumption

Coal HHV Trend

Coal Order Plan (WCO) vs Actual Received

Procurement adherence: monthly coal order plan (WCO) vs actual tonnage received.

PO Fulfillment (%)

Received as % of order; 100% = fully fulfilled.

Coal Projected Consumption / Incoming — Next 30 Days · INDIKATIF

Coal Projected Stock — Next 30 Days · INDIKATIF

Coal Board Recommendation

Silica Sand — OH Readiness & Recovery

BOD view for silica replacement requirement after overhaul, daily top-up, and recovery from boiler drain/manual sieving.

-

OH Plan Input

Silica Recovery Input

Operating Logic

After OH, fresh silica requirement is normally 100 ton. Daily silica consumption is treated mainly as top-up. Boiler drain silica is sieved manually and monitored as recovery stock.

Silica Purchase / Filling / Received

Silica Stock vs OH Requirement

Silica Projected Usage / Incoming — Next 30 Days · INDIKATIF

Silica Projected Stock — Next 30 Days · INDIKATIF

Silica Board Recommendation

LFO — Emergency & Start-up Readiness

BOD view for LFO reserve, usage split, replenishment and cover days.

-

LFO Usage Split

LFO Stock & Cover Days

LFO Projected Consumption / Incoming — Next 30 Days · INDIKATIF

LFO Projected Stock — Next 30 Days · INDIKATIF

LFO Board Recommendation

Limestone — Reagent Availability

BOD view for limestone stock, filling and reagent continuity.

-

Limestone Purchase Forecast / Filling / Received

Limestone Stock & Cover Days

Limestone Projected Consumption / Incoming — Next 30 Days · INDIKATIF

Limestone Projected Stock — Next 30 Days · INDIKATIF

Limestone Board Recommendation

Current month control room

Silica Daily Monitor — Current Month

Board-ready daily view for Silica Sand: stock runway, critical events, sieving recovery impact, and action required before month-end closing. Monthly dashboard remains locked to month-1 actual.

Silica daily data: -
Upload Excel template with Daily Monitor sheet.
Executive message
Silica daily status will appear after Excel upload.
The monitor highlights stock runway, event drivers, and required decision.

BOD decision focus

  • Upload the latest Daily Monitor sheet to generate the board message.

Stock trajectory vs threshold

Shows the daily closing stock, target stock and alert line, with event markers for major movements.

BOD main chart

Critical event timeline

Events that materially move the silica stock position.

Silica stock bridge

Opening stock to projected month-end closing stock.

Waterfall

Daily movement composition

Received, recovery from sieving, usage/filling and reject/waste.

Forward stock runway

Latest stock projection at D+7, D+14 and D+30 versus thresholds.

BOD action matrix

Simple translation from data to action.

Latest daily records

Data quality check

Threshold & Editable Action Plan

Manual setting for material status level. Thresholds are stored locally in the browser.

Safety Stock / Cover Days Threshold

Projection Assumption — Next 30 Days

Default projection uses selected-period daily consumption and trailing 3-month average incoming. Manual override can be entered for BOD scenario discussion.

Board Action Plan Editor